SERVER

Seismic Blast Planner

Rank #172,051

smithery/evozim-hv/seismic-blast-planner-mcp

Seismic Blast Planner is an enterprise-grade Model Context Protocol (MCP) micro-service from the M2MCent network. Premium agentic endpoint for seismic-blast-planner-mcp. Monetized via x402 on Base Mainnet ($0.25 USDC per execution). Zero-gas settlement.

Versions unknown
First listed
Aug 17, 2026
Last publish date
—
PURPOSE

What you can do with Seismic Blast Planner

Seismic Blast Planner is a Model Context Protocol (MCP) server. It ranks #172,051 of 186,990 active servers on MCP Toplist. Seismic Blast Planner is listed on Smithery; no version information is available from the registries that list it or from its repository. It was first listed on Aug 17, 2026.

Not verifiedMCP Toplist has not yet written a checked profile for this server, so the paragraph above is assembled from registry data only. Its registry listings below are the authority on what it does.

CAPABILITIES AND LIMITATIONS

What Seismic Blast Planner can and cannot do

Not verifiedMCP Toplist has not catalogued this server's tools or limitations. Check its registry listings below.

REQUIREMENTS

What you need before using Seismic Blast Planner

DeclaredRemote authHosted remote, sign-in declared

The hosted endpoint is declared as gated by authentication — connect via its URL and authenticate with the provider (OAuth flow or an API key/header, per its docs).

Declared by Smithery, last synced Nov 23, 2026. Not independently verified by MCP Toplist.

Declared in the registry install config

Hosted endpoint declared as requiring authentication.

INSTALLATION AND FIRST TASK

Connect Seismic Blast Planner and confirm it works

Remote · HTTP
claude mcp add --transport http seismic-blast-planner-mcp https://server.smithery.ai/evozim-hv/seismic-blast-planner-mcp/mcp

This endpoint requires authentication — see the server’s docs for credentials.

First successful task

After adding the config, ask your client to list this server's tools. A tool list confirms the connection; an empty list or an error means the server did not start or needs credentials.

MAINTENANCE AND EVIDENCE

What changed, and when this was checked

First listed
Aug 17, 2026
Version history
Unavailable — no registry exposes versions and no release tags were found
Requirements evidence
Declared by Smithery, last synced Nov 23, 2026. Not independently verified by MCP Toplist.
Profile checked
Not yet — purpose, capabilities and requirements above come from registry data only
Ranking data as of
Nov 23, 2026
Registry sightings

Do you maintain Seismic Blast Planner? to show as its verified maintainer and add your own summary, sign-in details and links. The rest of this page is read from the registry listings and from MCP Toplist's own connection check.

VERSIONS

Version information unavailable

The registry that lists this server does not expose version metadata, and no release tags were found on the linked repository. MCP Toplist cannot say how, or whether, this server is versioned.

STANDING
#172,051of 186,990 active servers

Ranks ahead of 14,939 of 186,990 servers on MCP Toplist.

BADGE

Show your rank

Maintain this server? Add the live rank badge to your README — it updates automatically as the leaderboard changes.

MCP Toplist: #172,051 of 186,990
Markdown
[![MCP Toplist](https://mcptoplist.com/badge/smithery%2Fevozim-hv%2Fseismic-blast-planner-mcp.svg)](https://mcptoplist.com/server/smithery%2Fevozim-hv%2Fseismic-blast-planner-mcp)
HTML
<a href="https://mcptoplist.com/server/smithery%2Fevozim-hv%2Fseismic-blast-planner-mcp"><img src="https://mcptoplist.com/badge/smithery%2Fevozim-hv%2Fseismic-blast-planner-mcp.svg" alt="MCP Toplist: #172,051 of 186,990" /></a>

Variants: append ?metric=score or ?metric=stars to the image URL.

FAQ

Frequently asked questions

Is Seismic Blast Planner listed on the Official MCP Registry?
Seismic Blast Planner is not on the Official MCP Registry. It is listed on Smithery.
How many versions does Seismic Blast Planner have?
Version information is unavailable for Seismic Blast Planner: no registry that lists it exposes version metadata, and no release tags were found on its repository.
Used in projects

Do you run this server?

Community projects list the MCP servers behind real agents and apps. Publish yours and this page will link to it.

EXPLORE